TEHRAN (Tasnim) A seabed gas pipeline leakage in phase 12 of Irans South Pars gas field resulted in negotiation between Iran and a contractor from the UAE as Iranian side is trying to repair the pipeline.
According to Tasnim dispatches, the Iranian Pars Oil and Gas Company and Petropars Company are now studying how to repair the seabed gas pipeline....